Changelog
What changed, and when.
One line per change to the product, dated the day it went live (Australian Eastern Standard Time).
- 8 Nov 2026 Very large pages are read at reduced size instead of the file being refused.
- 6 Nov 2026 Processing restarts automatically if it stalls.
- 5 Nov 2026 The chronology waits for all uploads to finish, says when files are added, and reads stamped scans.
- 4 Nov 2026 Deleting a matter stops its running work first, destroys the data, then verifies nothing is left; the database refuses writes to a deleted matter.
- 29 Oct 2026 Every dated row and measurement in a measurement table becomes its own entry, read by code. The same finding told twice from the same quote is one entry.
- 29 Oct 2026 Malformed PDFs are refused in plain words instead of hanging the upload. Tenant isolation is tested on every route and every table, per account.
- 29 Oct 2026 Chronology view for customers: no staff-only tags or tools; faster first page and PDF. The audit log never records a credential.
- 28 Oct 2026 Paid plans open: pay as you go, Solo and Solo Plus, with tax invoices. Refunds, disputes and plan cancellation are recorded and confirmed by email. Unreadable PDFs are explained in plain words.
